Demolition Permits in Ballarat: Report and Consent, Surveyors and Heritage

Who approves what in Victoria

  1. Building surveyor. Issues the building permit for demolition.
  2. City of Ballarat: report and consent (s29A). Required where demolition, over three years, would remove more than half the building's volume, or affect any part of a street-facing facade (including verandahs, chimneys and roof planes).
  3. Planning permit. Often required in a Heritage Overlay. Council will not give consent if a required planning permit has not been obtained.
  4. Service authorities. Power, gas, water and sewer are abolished or disconnected by the relevant authorities and licensed trades.
  5. Asbestos. It must be identified and, so far as reasonably practicable, removed before domestic demolition. Licensed removal is required above 10 m² of non-friable asbestos, and for any friable asbestos.

Heritage in Ballarat

Large parts of Ballarat sit in heritage precincts. Check the overlay before you sign a building contract, because heritage demolition can take months.

Sources

Get a quote for your demolition job

Free, no-obligation enquiry. Include your suburb, what needs removing and photos if you can.

Prefer to talk? Call [PHONE TBC].

[TURNSTILE KEY TBC] Spam check goes here once the Turnstile site key is added.

This form sends your project enquiry to Ballarat Demolition Service at [email protected]. If you tick the consent box, your enquiry will also be shared with our independent service partner once one is appointed, so they can contact you. Please don't include sensitive personal information.